I took an archaeo student from Bristiol to see Silbaby today and was stunned to find another load of flytipping has taken place. I estimate roughly 30+ tons of hardcore and several van loads of topsoil.
It has totaly changed the profile of one side of the mound.
The photo here
http://peteglastonbury.ic24.net/Rubble.jpg
shows the top. Everything on the left between me and the person in the background is new!
It has pushed over at least 4 large trees as it spilled over the edge!
Time for HA to reconsider this as a campaign?
PeteG